Unit Heater Replacement, Aurora, ON

Replacement of a Unit Heater (RTU) at a commercial facility in Aurora, Ontario
City of Vaughan-01
City of Vaughan-02

project details

Client: LCBO Aurora
Project Start: 2025
Product Required: Unit Heater

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Feel free to contact us via email or phone and we will get back to you within one business day.

About Project

MEECO Technologies Inc. completed the successful replacement of a unit heater at an LCBO location in Aurora, Ontario. This project involved the removal of the existing heating equipment and the installation of a new, energy-efficient unit heater designed to improve system reliability, performance, and overall comfort within the facility.

The Scope of Work

Our team carefully coordinated all phases of the project to ensure the work was completed efficiently and with minimal disruption to the store’s operations. From equipment handling and installation to system testing and final commissioning, the MEECO Technologies Inc. crew demonstrated professionalism, technical expertise, and strong attention to detail throughout the entire process.

Safety remained a top priority during the project. All work was carried out in full compliance with applicable health and safety regulations, industry standards, and site-specific requirements. 

The team followed all necessary procedures to maintain a safe and organized work environment while ensuring the installation was completed to the highest standards of quality and performance.

Why Choose MEECO?

This project reflects MEECO Technologies Inc.’s ongoing commitment to delivering dependable HVAC and heating solutions for commercial facilities across Ontario. 

By combining quality workmanship, efficient project execution, and a strong focus on customer satisfaction, we continue to provide reliable mechanical solutions tailored to the needs of our clients.

LCBO Aurora-
LCBO Aurora-02
Unit Heater Replacement – LCBO Aurora

Our Approach And Solution

The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP.