About Project

MEECO Technologies Inc. successfully completed the replacement of eight rooftop HVAC units (RTUs) at a commercial facility in Leamington, Ontario. 

This large-scale mechanical project involved the removal of existing rooftop equipment and the installation of new high-efficiency units designed to improve the building’s heating, cooling, and overall energy performance.

The Scope of Work

Due to the scope of the project, careful planning and coordination were essential to ensure the work was completed safely, efficiently, and with minimal disruption to the facility’s operations. Our team managed every phase of the project, including crane coordination, rooftop access, equipment placement, and system integration. 

The MEECO Technologies Inc. crew worked diligently throughout the installation process, demonstrating strong technical expertise, professionalism, and attention to detail to ensure all eight units were installed successfully and on schedule.

Safety remained a top priority during every stage of the project. All work was carried out in strict compliance with applicable health and safety regulations, industry standards, and site-specific safety procedures. 

Our technicians followed all required protocols to maintain a safe working environment while ensuring the highest standards of quality and workmanship were achieved throughout the installation.

Why Choose MEECO?

This project highlights MEECO Technologies Inc.’s ability to successfully manage and execute large commercial HVAC replacement projects across Ontario. 

Through dependable project management, skilled workmanship, and a commitment to safety and customer satisfaction, we continue to provide reliable and energy-efficient HVAC solutions tailored to the needs of our clients.

Leamington Rooftop HVAC Replacement -02
Leamington Rooftop HVAC Replacement -06
Commercial Rooftop Unit (RTU) Replacement Leamington

Our Approach And Solution

The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP.