Commercial Boiler Replacement Mississauga

Removing the existing boiler system and installing a new high-efficiency boiler

project details

Client: A Mississauga Commercial Facility
Project Start: 2026
Product Required: High-Efficiency Boiler

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Feel free to contact us via email or phone and we will get back to you within one business day.

About Project

MEECO completed a commercial boiler replacement project in Mississauga, Ontario, near Queen Elizabeth Way and Mississauga Road. The project involved removing the existing boiler system and installing a new high-efficiency boiler to provide improved heating performance and long-term system reliability.

Commercial Boiler Replacement

The existing boiler system was removed as part of the mechanical upgrade, making way for new high-efficiency boiler equipment. MEECO’s team completed the replacement with a focus on reliable operation and proper integration with the building’s existing heating infrastructure.

Replacing commercial boiler equipment is an important investment in the performance and reliability of a building’s heating system. A modern high-efficiency boiler can help support efficient heat generation while providing dependable operation for ongoing building needs.

High-Efficiency Heating Upgrade

The installation of new high-efficiency boiler equipment provides an opportunity to improve the overall performance of a commercial heating system. The upgraded equipment is designed to deliver reliable heating while supporting more efficient operation compared with the replaced system.

MEECO provides commercial boiler replacement and HVAC services for commercial, institutional, and industrial properties throughout Mississauga and the Greater Toronto Area.

Why Choose MEECO?

This RTU replacement project reflects MEECO Technologies Inc.’s ongoing commitment to delivering dependable commercial HVAC solutions across Ontario. 

By combining quality workmanship, efficient project management, and a strong focus on safety and customer satisfaction, we continue to provide reliable and energy-efficient mechanical systems tailored to our clients’ operational needs.

High-Efficiency Boiler Replacement Mississauga
Community Centre Heating Equipment Upgrade Vaughan-02
Community Centre Heating Equipment Upgrade Vaughan-03

Our Approach And Solution

The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP.